Previous Page
You are viewing - Project List -Department of the Interior, Green Parking Lot
Department of the Interior, Green Parking Lot
Washington, DC.
CDDI was responsible for geotechnical
study and surveying services.
Geotechnical Study:
- Existing
pavement condition evaluation
- Subsurface soil/fill condition explored by sample
drilling
- Laboratory tests performed for the encountered
sub-soils
- Geotechnical report including a summary of field and
laboratory investigation results and subsurface soil parameters, pavement design and construction methods for the new parking lot.
Surveying Services:
- Establishment of Horizontal & Vertical Control
- Topographic Mapping
- As-Built Utility Mapping
- Preparation of a Topographic Survey